Key Takeaway
Cadet No. 1 Dam is classified as high hazard in Missouri. It was completed in 1968 and is 58 years old. Its primary use is tailings. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 53 ft (taller than 95.9% in MO) |
| Dam Length | 1,100 ft |
| Dam Type | Earth |
| Max Storage | 264 acre-ft |
| Normal Storage | 264 acre-ft |
| Surface Area | 13 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 164 cfs |
| Year Completed | 1968 (58 years old) |
| Year Modified | 1994 |
| NID ID | MO30704 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Private
Nearby Dams
Bottom Diggins Dam
Washington, MO
High Hazard 41 ftCadet No. 2 Dam
Washington, MO
High Hazard 77 ftDresser Minerals #7 Dam North(Dry)
Washington, MO
High Hazard 15 ftCadet No. 3 Dam
Washington, MO
High Hazard 74 ftOld Wolf Dam
Washington, MO
High Hazard 48 ftDresser Minerals No 7 Dam (Dry)
Washington, MO
Low Hazard 30 ftDresser Minerals #7 Dam South (Dry)
Washington, MO
High Hazard 35 ftPowder Spring Lake Dam
Washington, MO
High Hazard 28 ftFrequently Asked Questions
What is the hazard classification of Cadet No. 1 Dam?
Cadet No. 1 Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Cadet No. 1 Dam?
Cadet No. 1 Dam is owned by information not available (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Cadet No. 1 Dam built?
Cadet No. 1 Dam was completed in 1968, making it 58 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Cadet No. 1 Dam?
Cadet No. 1 Dam serves the following purposes: Tailings. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Cadet No. 1 Dam?
Cadet No. 1 Dam has a dam height of 53 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Cadet No. 1 Dam last inspected?
Cadet No. 1 Dam was last inspected on October 21, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.