Bulldog Lake Dam
Key Takeaway
Bulldog Lake Dam is classified as low hazard in Michigan. It was completed in 1916 and is 110 years old. Its primary use is recreation.
Physical Details
| Dam Height | 7 ft (taller than 1.3% in MI) |
| Dam Length | 75 ft |
| Dam Type | Gravity |
| Max Storage | 587 acre-ft |
| Normal Storage | 267 acre-ft |
| Surface Area | 160 acres |
| Drainage Area | 5 sq mi |
| Year Completed | 1916 (110 years old) |
| NID ID | MI00870 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Ottawa National Forest
Federal Government
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Bulldog Lake Dam?
Bulldog Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Bulldog Lake Dam?
Bulldog Lake Dam is owned by Ottawa National Forest (Federal Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Bulldog Lake Dam built?
Bulldog Lake Dam was completed in 1916, making it 110 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Bulldog Lake Dam?
Bulldog Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Bulldog Lake Dam?
Bulldog Lake Dam has a dam height of 7 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Bulldog Lake Dam last inspected?
Bulldog Lake Dam was last inspected on September 8, 2005. Inspection dates indicate when a formal review occurred, not the results of that inspection.