Buffalo-Red Project No. 5
Key Takeaway
Buffalo-Red Project No. 5 is classified as low hazard in Minnesota. It was completed in 1983 and is 43 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 12 ft (taller than 41.3% in MN) |
| Dam Length | 1,250 ft |
| Dam Type | Earth |
| Max Storage | 496 acre-ft |
| Drainage Area | 9 sq mi |
| Max Discharge | 317 cfs |
| Year Completed | 1983 (43 years old) |
| NID ID | MN01006 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
WD of Buffalo-Red River
Local Government
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Buffalo-Red Project No. 5?
Buffalo-Red Project No. 5 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Buffalo-Red Project No. 5?
Buffalo-Red Project No. 5 is owned by WD of Buffalo-Red River (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Buffalo-Red Project No. 5 built?
Buffalo-Red Project No. 5 was completed in 1983, making it 43 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Buffalo-Red Project No. 5?
Buffalo-Red Project No. 5 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Buffalo-Red Project No. 5?
Buffalo-Red Project No. 5 has a dam height of 12 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Buffalo-Red Project No. 5 last inspected?
Buffalo-Red Project No. 5 was last inspected on August 30, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.