Brushy Creek Dam #8
Key Takeaway
Brushy Creek Dam #8 is classified as high hazard in North Carolina. It was completed in 1965 and is 61 years old. Its primary use is other. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 1,717 ft |
| Dam Type | Other |
| Max Storage | 150 acre-ft |
| Normal Storage | 150 acre-ft |
| Surface Area | 10 acres |
| Drainage Area | 30 sq mi |
| Year Completed | 1965 (61 years old) |
| NID ID | NC01852 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Sibelco North America, Inc.
Private
Nearby Dams
Weatherman Dam
Avery, NC
High HazardSpruce Pine Water Supply Dam #1
Mitchell, NC
High HazardCrystal Water Supply Pond Dam
Mitchell, NC
Low HazardHawkins Sediment Basin 4 Dam
Mitchell, NC
High HazardSwiss Pine Lake Dam
Mitchell, NC
High HazardSpruce Pine Water Supply Dam #2
Mitchell, NC
Low HazardSloop Lake Dam
Avery, NC
Significant HazardDeer Park Lake Dam
Mitchell, NC
Significant HazardFrequently Asked Questions
What is the hazard classification of Brushy Creek Dam #8?
Brushy Creek Dam #8 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Brushy Creek Dam #8?
Brushy Creek Dam #8 is owned by Sibelco North America, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Brushy Creek Dam #8 built?
Brushy Creek Dam #8 was completed in 1965, making it 61 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Brushy Creek Dam #8?
Brushy Creek Dam #8 serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Brushy Creek Dam #8 last inspected?
Brushy Creek Dam #8 was last inspected on March 25, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.