Brookside Mill Dam
Key Takeaway
Brookside Mill Dam is classified as significant hazard in Massachusetts. It was completed in 1862 and is 164 years old. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 16 ft (taller than 56.3% in MA) |
| Dam Length | 83 ft |
| Dam Type | Masonry |
| Max Storage | 18 acre-ft |
| Normal Storage | 0 acre-ft |
| Drainage Area | 38 sq mi |
| Year Completed | 1862 (164 years old) |
| NID ID | MA00131 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
TRUSTEES OF THE BROOKSIDE CONDOMINIUM TRUST
Private
Nearby Dams
Stony Brook Dam
Middlesex, MA
Significant Hazard 15 ftNabnasset Pond Dam
Middlesex, MA
Significant Hazard 14 ftWestford Depot Dam
Middlesex, MA
Significant Hazard 12 ftFletcher Pond Dam
Middlesex, MA
Significant Hazard 24 ftFreeman Lake Dam
Middlesex, MA
Significant Hazard 29 ftStony Brook Dam
Middlesex, MA
Significant Hazard 24 ftUpper Flint Pond Dam
Middlesex, MA
Significant Hazard 10 ftLower Flint Pond Dam
Middlesex, MA
Low Hazard 28 ftFrequently Asked Questions
What is the hazard classification of Brookside Mill Dam?
Brookside Mill Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Brookside Mill Dam?
Brookside Mill Dam is owned by TRUSTEES OF THE BROOKSIDE CONDOMINIUM TRUST (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Brookside Mill Dam built?
Brookside Mill Dam was completed in 1862, making it 164 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Brookside Mill Dam?
Brookside Mill Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Brookside Mill Dam?
Brookside Mill Dam has a dam height of 16 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Brookside Mill Dam last inspected?
Brookside Mill Dam was last inspected on September 20, 2016. Inspection dates indicate when a formal review occurred, not the results of that inspection.