Brian Head Phase Iii

OFF CHANNEL· Iron, Utah· Built 1993· Earth·
Significant Hazard Water Supply Private

Key Takeaway

Brian Head Phase Iii is classified as significant hazard in Utah. It was completed in 1993 and is 33 years old. Its primary use is water supply. Significant hazard means failure could cause economic or environmental damage. Learn more.

Physical Details

Dam Length1,620 ft
Dam TypeEarth
Max Storage60 acre-ft
Normal Storage40 acre-ft
Drainage Area0 sq mi
Max Discharge28 cfs
Year Completed1993 (33 years old)
NID IDUT00762

Safety Information

Significant Hazard

No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: October 11, 2023
State Regulated: Yes
Regulatory Agency: Utah Division of Water Rights

Ownership

BRIAN HEAD RESORT

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Brian Head Phase Iii?

Brian Head Phase Iii is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Brian Head Phase Iii?

Brian Head Phase Iii is owned by BRIAN HEAD RESORT (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Brian Head Phase Iii built?

Brian Head Phase Iii was completed in 1993, making it 33 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Brian Head Phase Iii?

Brian Head Phase Iii serves the following purposes: Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

When was Brian Head Phase Iii last inspected?

Brian Head Phase Iii was last inspected on October 11, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.