Brewster Pond Dam
Key Takeaway
Brewster Pond Dam is classified as significant hazard in Connecticut. It was completed in 1854 and is 172 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 13 ft (taller than 50.2% in CT) |
| Dam Length | 480 ft |
| Dam Type | Earth |
| Normal Storage | 331 acre-ft |
| Surface Area | 66 acres |
| Drainage Area | 4 sq mi |
| Max Discharge | 480 cfs |
| Year Completed | 1854 (172 years old) |
| NID ID | CT00555 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Connecticut DEEP
State Government
Nearby Dams
Whiting River Flood Control Dam
Litchfield, CT
High Hazard 80 ftCookson Pond Dam
Berkshire, MA
Significant Hazard 24 ftIndustrial Monument Dam
Litchfield, CT
Significant Hazard 14 ftThousand Acre Lake Dam
Berkshire, MA
High Hazard 33 ftWood Creek Pond Dam
Litchfield, CT
Significant Hazard 22 ftWood Creek Flood Control Dam Site #9
Litchfield, CT
High Hazard 36 ftWindemere Lake Dam
Berkshire, MA
Low Hazard 40 ftWangum Lake Dam
Litchfield, CT
Significant Hazard 10 ftFrequently Asked Questions
What is the hazard classification of Brewster Pond Dam?
Brewster Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Brewster Pond Dam?
Brewster Pond Dam is owned by Connecticut DEEP (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Brewster Pond Dam built?
Brewster Pond Dam was completed in 1854, making it 172 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Brewster Pond Dam?
Brewster Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Brewster Pond Dam?
Brewster Pond Dam has a dam height of 13 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Brewster Pond Dam last inspected?
Brewster Pond Dam was last inspected on May 13, 2015. Inspection dates indicate when a formal review occurred, not the results of that inspection.