Braxton Moody Dam No. 2
Key Takeaway
Braxton Moody Dam No. 2 is classified as low hazard in Louisiana. Its primary use is recreation.
Physical Details
| Dam Height | 30 ft (taller than 87.3% in LA) |
| Dam Length | 624 ft |
| Dam Type | Earth |
| Max Storage | 90 acre-ft |
| Normal Storage | 70 acre-ft |
| Surface Area | 6 acres |
| Max Discharge | 64 cfs |
| NID ID | LA00412 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Braxton Moody, IV
Private
Nearby Dams
Braxton Moody Dam No. 3
West Feliciana, LA
Significant Hazard 25 ftBraxton Moody Dam No. 1
West Feliciana, LA
High Hazard 30 ftWoodlawn Lake
West Feliciana, LA
Low Hazard 37 ftHavenwood Farms Dam
West Feliciana, LA
Low Hazard 18 ftLake Rosemound Dam
West Feliciana, LA
Significant Hazard 30 ftWoodlawn Plantation Dam No 1
West Feliciana, LA
Low Hazard 20 ftWoodlawn Plantation Dam No 3
West Feliciana, LA
Low Hazard 17 ftWoodlawn Plantation Dam No 2
West Feliciana, LA
Low Hazard 21 ftFrequently Asked Questions
What is the hazard classification of Braxton Moody Dam No. 2?
Braxton Moody Dam No. 2 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Braxton Moody Dam No. 2?
Braxton Moody Dam No. 2 is owned by Braxton Moody, IV (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Braxton Moody Dam No. 2?
Braxton Moody Dam No. 2 serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Braxton Moody Dam No. 2?
Braxton Moody Dam No. 2 has a dam height of 30 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Braxton Moody Dam No. 2 last inspected?
Braxton Moody Dam No. 2 was last inspected on August 19, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.