Boyer Lake
Key Takeaway
Boyer Lake is classified as high hazard in Utah. It was completed in 1939 and is 87 years old. Its primary use is irrigation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 850 ft |
| Dam Type | Earth |
| Max Storage | 1.3K acre-ft |
| Normal Storage | 1.2K acre-ft |
| Drainage Area | 2 sq mi |
| Max Discharge | 24 cfs |
| Year Completed | 1939 (87 years old) |
| NID ID | UT00052 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
CHALK CREEK-HOYTSVILLE IRRIGATION
Private
Nearby Dams
Joyce
Summit, UT
Low HazardHenrietta Dam
Summit, UT
Significant HazardYellow Lakes Dam
Summit, UT
Significant HazardWhitney
Summit, UT
High HazardSmith and Morehouse
Summit, UT
High HazardSand Lake
Summit, UT
Significant HazardFish Lake
Summit, UT
High HazardAbes Lake
Summit, UT
Significant HazardFrequently Asked Questions
What is the hazard classification of Boyer Lake?
Boyer Lake is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Boyer Lake?
Boyer Lake is owned by CHALK CREEK-HOYTSVILLE IRRIGATION (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Boyer Lake built?
Boyer Lake was completed in 1939, making it 87 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Boyer Lake?
Boyer Lake serves the following purposes: Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Boyer Lake last inspected?
Boyer Lake was last inspected on July 27, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.