Box Creek - Lower (Beaver Creek)
Key Takeaway
Box Creek - Lower (Beaver Creek) is classified as high hazard in Utah. It was completed in 1925 and is 101 years old. Its primary use is irrigation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 500 ft |
| Dam Type | Earth |
| Max Storage | 382 acre-ft |
| Normal Storage | 231 acre-ft |
| Drainage Area | 13 sq mi |
| Max Discharge | 21 cfs |
| Year Completed | 1925 (101 years old) |
| NID ID | UT00024 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
BEAVER CREEK IRRIGATION & RESERVOIR CO.
Private
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Box Creek - Lower (Beaver Creek)?
Box Creek - Lower (Beaver Creek) is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Box Creek - Lower (Beaver Creek)?
Box Creek - Lower (Beaver Creek) is owned by BEAVER CREEK IRRIGATION & RESERVOIR CO. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Box Creek - Lower (Beaver Creek) built?
Box Creek - Lower (Beaver Creek) was completed in 1925, making it 101 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Box Creek - Lower (Beaver Creek)?
Box Creek - Lower (Beaver Creek) serves the following purposes: Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Box Creek - Lower (Beaver Creek) last inspected?
Box Creek - Lower (Beaver Creek) was last inspected on July 14, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.