Boiling Springs Lake Upper Dam
Key Takeaway
Boiling Springs Lake Upper Dam is classified as high hazard in North Carolina. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 600 ft |
| Dam Type | Earth |
| Max Storage | 300 acre-ft |
| Normal Storage | 0 acre-ft |
| Surface Area | 80 acres |
| Drainage Area | 240 sq mi |
| Max Discharge | 0 cfs |
| NID ID | NC05978 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
City of Boiling Spring Lakes
Local Government
Nearby Dams
Upper (Allen Creek) Dam
Brunswick, NC
High HazardPine Lake Dam
Brunswick, NC
Low HazardNorth Lake Dam
Brunswick, NC
Low HazardBoiling Springs Lake Dam
Brunswick, NC
High HazardOrton Lake Dam
Brunswick, NC
Low HazardMotsu Disposal Dike
Brunswick, NC
Low HazardAdm-904 Aeration Basin Dike
Brunswick, NC
Low HazardFrequently Asked Questions
What is the hazard classification of Boiling Springs Lake Upper Dam?
Boiling Springs Lake Upper Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Boiling Springs Lake Upper Dam?
Boiling Springs Lake Upper Dam is owned by City of Boiling Spring Lakes (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Boiling Springs Lake Upper Dam?
Boiling Springs Lake Upper Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Boiling Springs Lake Upper Dam last inspected?
Boiling Springs Lake Upper Dam was last inspected on January 22, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.