Blind Pony Dam

PONY CREEK· Saline, Missouri· Built 1968· Earth· 35 ft tall
Low Hazard Recreation State Government

Key Takeaway

Blind Pony Dam is classified as low hazard in Missouri. It was completed in 1968 and is 58 years old. Its primary use is recreation.

Physical Details

Dam Height 35 ft (taller than 85.5% in MO)
Dam Length2,300 ft
Dam TypeEarth
Max Storage2.0K acre-ft
Normal Storage1.8K acre-ft
Surface Area95 acres
Drainage Area5 sq mi
Max Discharge4,067 cfs
Year Completed1968 (58 years old)
NID IDMO20041

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: April 1, 2021
State Regulated: Yes
Regulatory Agency: Dam and Reservoir Safety Program

Ownership

MO DEPT OF CONSERVATION

State Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Blind Pony Dam?

Blind Pony Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Blind Pony Dam?

Blind Pony Dam is owned by MO DEPT OF CONSERVATION (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Blind Pony Dam built?

Blind Pony Dam was completed in 1968, making it 58 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Blind Pony Dam?

Blind Pony Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Blind Pony Dam?

Blind Pony Dam has a dam height of 35 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Blind Pony Dam last inspected?

Blind Pony Dam was last inspected on April 1, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.