Blast & Cast Pond Dam
Key Takeaway
Blast & Cast Pond Dam is classified as significant hazard in Connecticut. It was completed in 1953 and is 73 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 20 ft (taller than 72.5% in CT) |
| Dam Length | 320 ft |
| Dam Type | Earth |
| Normal Storage | 75 acre-ft |
| Surface Area | 5 acres |
| Drainage Area | 2 sq mi |
| Year Completed | 1953 (73 years old) |
| NID ID | CT00316 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Five S. Group LLC
Private
Nearby Dams
Abby Road Pond Dam
Hartford, CT
Significant Hazard 4 ftBarber Hill Road Pond #1 Dam
Hartford, CT
Significant Hazard 3 ftWindsorville Pond Dam
Hartford, CT
Significant Hazard 17 ftPodunk Pond Dam
Hartford, CT
Significant Hazard 15 ftAvery Street Detention Pond Dam
Hartford, CT
Significant Hazard 13 ftBroad Brook Mill Pond Dam
Hartford, CT
Significant Hazard 21 ftAvery Flood Control Site #2 Dam
Hartford, CT
High Hazard 23 ftAvery Flood Control Site #1 Dam
Hartford, CT
High Hazard 20 ftFrequently Asked Questions
What is the hazard classification of Blast & Cast Pond Dam?
Blast & Cast Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Blast & Cast Pond Dam?
Blast & Cast Pond Dam is owned by Five S. Group LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Blast & Cast Pond Dam built?
Blast & Cast Pond Dam was completed in 1953, making it 73 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Blast & Cast Pond Dam?
Blast & Cast Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Blast & Cast Pond Dam?
Blast & Cast Pond Dam has a dam height of 20 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Blast & Cast Pond Dam last inspected?
Blast & Cast Pond Dam was last inspected on June 9, 2016. Inspection dates indicate when a formal review occurred, not the results of that inspection.