Bill Ellis Lagoon Dam is classified as significant hazard in North Carolina. It was completed in 1988 and is 38 years old. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.

Physical Details

Dam Length800 ft
Dam TypeEarth
Max Storage0 acre-ft
Normal Storage26 acre-ft
Surface Area3 acres
Drainage Area3 sq mi
Max Discharge0 cfs
Year Completed1988 (38 years old)
NID IDNC04708

Safety Information

Significant Hazard

No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: February 3, 2021
State Regulated: No

Ownership

Nash Pigg Rentals, LLC

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Bill Ellis Lagoon Dam?

Bill Ellis Lagoon Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Bill Ellis Lagoon Dam?

Bill Ellis Lagoon Dam is owned by Nash Pigg Rentals, LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Bill Ellis Lagoon Dam built?

Bill Ellis Lagoon Dam was completed in 1988, making it 38 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Bill Ellis Lagoon Dam?

Bill Ellis Lagoon Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

When was Bill Ellis Lagoon Dam last inspected?

Bill Ellis Lagoon Dam was last inspected on February 3, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.