Big Hungry River Dam
Key Takeaway
Big Hungry River Dam is classified as significant hazard in North Carolina. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 187 ft |
| Dam Type | Concrete |
| Max Storage | 48 acre-ft |
| Normal Storage | 5 acre-ft |
| Surface Area | 4 acres |
| NID ID | NC03036 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
NC Wildlife Resources Commission
State Government
Nearby Dams
English Heifer Cove Dam
Polk, NC
Significant HazardNewman Dam
Henderson, NC
Significant HazardBall Lake Dam
Henderson, NC
High HazardGamblin Dam
Polk, NC
Significant HazardLittle Lake Dam
Henderson, NC
High HazardMacedonia Lake Dam
Henderson, NC
High HazardPalmetto Lake Upper Dam
Polk, NC
Significant HazardPalmetto Lake Lower Dam
Polk, NC
Significant HazardFrequently Asked Questions
What is the hazard classification of Big Hungry River Dam?
Big Hungry River Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Big Hungry River Dam?
Big Hungry River Dam is owned by NC Wildlife Resources Commission (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Big Hungry River Dam?
Big Hungry River Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Big Hungry River Dam last inspected?
Big Hungry River Dam was last inspected on August 22, 2012. Inspection dates indicate when a formal review occurred, not the results of that inspection.