Bibey Pond Dam #1
Key Takeaway
Bibey Pond Dam #1 is classified as high hazard in North Carolina. Its primary use is irrigation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 465 ft |
| Dam Type | Earth |
| Max Storage | 7 acre-ft |
| Normal Storage | 6 acre-ft |
| Surface Area | 1 acres |
| NID ID | NC05037 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Noel C Roberts
Private
Nearby Dams
Bibey Pond Dam #2
Moore, NC
High HazardThagards Lake Dam
Moore, NC
High HazardPine Lake Dam
Moore, NC
High HazardRockery Pond Dam
Moore, NC
High HazardShadow Lake Dam
Moore, NC
Low HazardWhisper Lake Dam
Moore, NC
Low HazardMatthews Lake Dam
Moore, NC
Low HazardSpring Valley Lake Dam
Moore, NC
High HazardFrequently Asked Questions
What is the hazard classification of Bibey Pond Dam #1?
Bibey Pond Dam #1 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Bibey Pond Dam #1?
Bibey Pond Dam #1 is owned by Noel C Roberts (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Bibey Pond Dam #1?
Bibey Pond Dam #1 serves the following purposes: Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Bibey Pond Dam #1 last inspected?
Bibey Pond Dam #1 was last inspected on June 8, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.