Bedford At Falls River Dam #1

Wake, North Carolina· Built 2004· Earth·
High Hazard Flood Risk Reduction Private

Key Takeaway

Bedford At Falls River Dam #1 is classified as high hazard in North Carolina. It was completed in 2004 and is 22 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Length310 ft
Dam TypeEarth
Max Storage4 acre-ft
Max Discharge80 cfs
Year Completed2004 (22 years old)
NID IDNC06066

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: February 15, 2022
State Regulated: Yes
Regulatory Agency: NCDEQ, DEMLR, Dam Safety Program

Ownership

Bedford at Falls River Master Association, Inc.

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Bedford At Falls River Dam #1?

Bedford At Falls River Dam #1 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Bedford At Falls River Dam #1?

Bedford At Falls River Dam #1 is owned by Bedford at Falls River Master Association, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Bedford At Falls River Dam #1 built?

Bedford At Falls River Dam #1 was completed in 2004, making it 22 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Bedford At Falls River Dam #1?

Bedford At Falls River Dam #1 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

When was Bedford At Falls River Dam #1 last inspected?

Bedford At Falls River Dam #1 was last inspected on February 15, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.