Bedford At Falls River Dam #1
Key Takeaway
Bedford At Falls River Dam #1 is classified as high hazard in North Carolina. It was completed in 2004 and is 22 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 310 ft |
| Dam Type | Earth |
| Max Storage | 4 acre-ft |
| Max Discharge | 80 cfs |
| Year Completed | 2004 (22 years old) |
| NID ID | NC06066 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Bedford at Falls River Master Association, Inc.
Private
Nearby Dams
Bedford At Falls River Dam #2
Wake, NC
Significant HazardFalls Lake Dam
Wake, NC
High Hazard 92 ftWakefield Lake Dam #2
Wake, NC
Low HazardWakefield Lake Dam #1
Wake, NC
Low HazardE.M. Johnson Detention Basin Dam
Wake, NC
Significant HazardE.M. Johnson Water Plant A Dam
Wake, NC
High HazardE.M. Johnson Water Plant B Dam
Wake, NC
High HazardEm Johnson Alum Sludge Lagoon Dam
Wake, NC
High HazardFrequently Asked Questions
What is the hazard classification of Bedford At Falls River Dam #1?
Bedford At Falls River Dam #1 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Bedford At Falls River Dam #1?
Bedford At Falls River Dam #1 is owned by Bedford at Falls River Master Association, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Bedford At Falls River Dam #1 built?
Bedford At Falls River Dam #1 was completed in 2004, making it 22 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Bedford At Falls River Dam #1?
Bedford At Falls River Dam #1 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Bedford At Falls River Dam #1 last inspected?
Bedford At Falls River Dam #1 was last inspected on February 15, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.