Banner Mill Tailings Dam

BANNER CANYON· Hidalgo, New Mexico· Built 2010· Rockfill· 38 ft tall
Significant Hazard Tailings Private

Key Takeaway

Banner Mill Tailings Dam is classified as significant hazard in New Mexico. It was completed in 2010 and is 16 years old. Its primary use is tailings. Significant hazard means failure could cause economic or environmental damage. Learn more.

Physical Details

Dam Height 38 ft (taller than 60.7% in NM)
Dam Length300 ft
Dam TypeRockfill
Max Storage67 acre-ft
Normal Storage59 acre-ft
Surface Area4 acres
Drainage Area0 sq mi
Max Discharge1,475 cfs
Year Completed2010 (16 years old)
NID IDNM00670

Safety Information

Significant Hazard

No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: May 22, 2018
State Regulated: Yes
Regulatory Agency: OFFICE OF THE STATE ENGINEER

Ownership

PYRAMID PEAK MINING, LLC

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Banner Mill Tailings Dam?

Banner Mill Tailings Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Banner Mill Tailings Dam?

Banner Mill Tailings Dam is owned by PYRAMID PEAK MINING, LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Banner Mill Tailings Dam built?

Banner Mill Tailings Dam was completed in 2010, making it 16 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Banner Mill Tailings Dam?

Banner Mill Tailings Dam serves the following purposes: Tailings. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Banner Mill Tailings Dam?

Banner Mill Tailings Dam has a dam height of 38 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Banner Mill Tailings Dam last inspected?

Banner Mill Tailings Dam was last inspected on May 22, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.