Bacon Creek Watershed Site F-1 is classified as low hazard in Iowa. It was completed in 1981 and is 45 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 33 ft (taller than 63.3% in IA) |
| Dam Length | 390 ft |
| Dam Type | Earth |
| Max Storage | 28 acre-ft |
| Normal Storage | 15 acre-ft |
| Surface Area | 2 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1981 (45 years old) |
| NID ID | IA02173 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
City of Sioux City
Local Government
Nearby Dams
Bacon Creek Watershed Site C-1
Woodbury, IA
High Hazard 41 ftBacon Creek Watershed Site H-1-2
Woodbury, IA
Significant Hazard 40 ftBacon Creek Watershed Site H-1-3
Woodbury, IA
Significant Hazard 40 ftBacon Creek Watershed Site H-1-1
Woodbury, IA
Significant Hazard 40 ftBacon Creek Watershed Site H-2
Woodbury, IA
Low Hazard 33 ftBacon Creek Watershed Site A-2-6
Woodbury, IA
Significant Hazard 35 ftBacon Creek Watershed Site A-1-1
Woodbury, IA
High Hazard 36 ftBacon Creek Watershed Site A-2-2
Woodbury, IA
Significant Hazard 51 ftFrequently Asked Questions
What is the hazard classification of Bacon Creek Watershed Site F-1?
Bacon Creek Watershed Site F-1 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Bacon Creek Watershed Site F-1?
Bacon Creek Watershed Site F-1 is owned by City of Sioux City (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Bacon Creek Watershed Site F-1 built?
Bacon Creek Watershed Site F-1 was completed in 1981, making it 45 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Bacon Creek Watershed Site F-1?
Bacon Creek Watershed Site F-1 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Bacon Creek Watershed Site F-1?
Bacon Creek Watershed Site F-1 has a dam height of 33 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.