Antioch Church Road Dam
Key Takeaway
Antioch Church Road Dam is classified as high hazard in North Carolina. It was completed in 1993 and is 33 years old. Its primary use is irrigation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 753 ft |
| Dam Type | Earth |
| Max Storage | 1.0K acre-ft |
| Normal Storage | 555 acre-ft |
| Surface Area | 59 acres |
| Drainage Area | 1,593 sq mi |
| Max Discharge | 2,666 cfs |
| Year Completed | 1993 (33 years old) |
| NID ID | NC04407 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Adam W Fosnaugh
Private
Nearby Dams
Lake Providence Dam
Union, NC
High HazardCloer Dam
Union, NC
Significant HazardVillage of Wesley Chapel Dam
Union, NC
High HazardWaybridge At Weddington Dam
Union, NC
High HazardLaney Pond Dam
Union, NC
Significant HazardMccoy Farm Pond
Union, NC
High HazardPrice Dam
Union, NC
High HazardMcgee Dam
Union, NC
High HazardFrequently Asked Questions
What is the hazard classification of Antioch Church Road Dam?
Antioch Church Road Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Antioch Church Road Dam?
Antioch Church Road Dam is owned by Adam W Fosnaugh (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Antioch Church Road Dam built?
Antioch Church Road Dam was completed in 1993, making it 33 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Antioch Church Road Dam?
Antioch Church Road Dam serves the following purposes: Irrigation, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Antioch Church Road Dam last inspected?
Antioch Church Road Dam was last inspected on February 9, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.