Airport Center Dam #1
Key Takeaway
Airport Center Dam #1 is classified as low hazard in North Carolina. It was completed in 1984 and is 42 years old. Its primary use is recreation.
Physical Details
| Dam Length | 250 ft |
| Dam Type | Earth |
| Max Storage | 51 acre-ft |
| Normal Storage | 40 acre-ft |
| Surface Area | 7 acres |
| Drainage Area | 504 sq mi |
| Max Discharge | 831 cfs |
| Year Completed | 1984 (42 years old) |
| NID ID | NC02925 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Piedmont Triad Airport Authority
Private
Nearby Dams
Old Deep River Golf Course Dam
Guilford, NC
High HazardInnkeeper Detention Pond Dam
Guilford, NC
High HazardRice Dam
Guilford, NC
Low HazardKnox Lake Dam
Guilford, NC
Low HazardAmp Detention Dam
Guilford, NC
High HazardUpper Colonial Dam
Guilford, NC
Low HazardCardinal Cove Dam At Crystal Lake Dam
Guilford, NC
Low HazardHillside Lake Dam
Guilford, NC
High HazardFrequently Asked Questions
What is the hazard classification of Airport Center Dam #1?
Airport Center Dam #1 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Airport Center Dam #1?
Airport Center Dam #1 is owned by Piedmont Triad Airport Authority (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Airport Center Dam #1 built?
Airport Center Dam #1 was completed in 1984, making it 42 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Airport Center Dam #1?
Airport Center Dam #1 serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Airport Center Dam #1 last inspected?
Airport Center Dam #1 was last inspected on February 9, 2016. Inspection dates indicate when a formal review occurred, not the results of that inspection.