A. N. James Pond
Key Takeaway
A. N. James Pond is classified as low hazard in Louisiana. It was completed in 1958 and is 68 years old. Its primary use is recreation.
Physical Details
| Dam Height | 11 ft (taller than 16.4% in LA) |
| Dam Length | 435 ft |
| Dam Type | Earth |
| Max Storage | 199 acre-ft |
| Normal Storage | 104 acre-ft |
| Surface Area | 17 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 617 cfs |
| Year Completed | 1958 (68 years old) |
| NID ID | LA00509 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Rube Bates
Private
Nearby Dams
Frequently Asked Questions
What is the hazard classification of A. N. James Pond?
A. N. James Pond is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates A. N. James Pond?
A. N. James Pond is owned by Rube Bates (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was A. N. James Pond built?
A. N. James Pond was completed in 1958, making it 68 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of A. N. James Pond?
A. N. James Pond serves the following purposes: Recreation, Fish And Wildlife Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is A. N. James Pond?
A. N. James Pond has a dam height of 11 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was A. N. James Pond last inspected?
A. N. James Pond was last inspected on April 14, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.