2nd Broad River Watershed Dam #23
Key Takeaway
2nd Broad River Watershed Dam #23 is classified as high hazard in North Carolina. It was completed in 1979 and is 47 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 949 ft |
| Dam Type | Earth |
| Max Storage | 770 acre-ft |
| Normal Storage | 25 acre-ft |
| Surface Area | 12 acres |
| Drainage Area | 1,502 sq mi |
| Year Completed | 1979 (47 years old) |
| NID ID | NC04104 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Galax Corporation
Private
Nearby Dams
Woodrow Fountain Dam
Rutherford, NC
Low Hazard2nd Broad River Watershed Dam #11-19
Rutherford, NC
Low Hazard2nd Broad River Watershed Dam #11-25
Rutherford, NC
Low Hazard2nd Broad River Watershed Dam #11-24b
Rutherford, NC
Low Hazard2nd Broad River Watershed Dam #2
Rutherford, NC
High HazardSecond Broad River WS #11-18a Dam
McDowell, NC
Low Hazard2nd Broad River Watershed Dam #22
Rutherford, NC
High HazardSecond Broad River WS #11-20a Dam
McDowell, NC
Low HazardFrequently Asked Questions
What is the hazard classification of 2nd Broad River Watershed Dam #23?
2nd Broad River Watershed Dam #23 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates 2nd Broad River Watershed Dam #23?
2nd Broad River Watershed Dam #23 is owned by Galax Corporation (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was 2nd Broad River Watershed Dam #23 built?
2nd Broad River Watershed Dam #23 was completed in 1979, making it 47 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of 2nd Broad River Watershed Dam #23?
2nd Broad River Watershed Dam #23 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was 2nd Broad River Watershed Dam #23 last inspected?
2nd Broad River Watershed Dam #23 was last inspected on November 16, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.